Le Louvre
A 6-month project at the Le Louvre building: emergency response to a flood that affected the building from the 4th floor down to the 1st floor. The 4th floor unit was partially demolished (down to 40 cm from the floor), while the floors below were demolished completely. All units, from the 4th to the 1st floor, were fully renovated, including complete move and storage logistics for residents' furniture and appliances, through to the final return of their belongings.
A 6-month project at the Le Louvre building: emergency response to a flood that affected the building from the 4th floor down to the 1st floor. The 4th floor unit was partially demolished (down to 40 cm from the floor), while the floors below were demolished completely. All units, from the 4th to the 1st floor, were fully renovated, including complete move and storage logistics for residents' furniture and appliances, through to the final return of their belongings.